SECTION 4
Pronar T286
4.37
IMPORTANT!
When shifting the short load box, make certain that the load box rollers are not in front of
the trailer's rollers (mudguards may get damaged).
DANGER
Tipping the load box must be done on hard, level and flat ground.
Do NOT jerk the trailer forwards if load is bulky or reluctant to pour and does not unload.
Set the load box position on
the trailer frame, depending
on the load box length.
Press and hold the push-button for extending
the hook frame until the required position of
the load box is achieved.
The trailer must be set to "tipper" mode –
indicator light (9) is ON - figure (4.7).
Lock the load box.
Press and hold the push-button for extending
the load box interlock.
When indicator light (16) lights up, figure
(4.7) , keep the push-button pressed for 2-3
seconds.
Содержание T286
Страница 2: ......
Страница 6: ......
Страница 11: ...SECTION 1 BASIC INFORMATION ...
Страница 25: ...SECTION 2 SAFETY ADVICE ...
Страница 41: ...SECTION 3 DESIGN AND OPERATION ...
Страница 75: ...SECTION 4 CORRECT USE ...
Страница 117: ...SECTION 5 MAINTENANCE ...
Страница 155: ...SECTION 5 Pronar T286 5 39 FIGURE 5 14 Trailer s lubrication points part 1 ...
Страница 156: ...Pronar T286 SECTION 5 5 40 FIGURE 5 15 Trailer s lubrication points part 2 ...
Страница 165: ...NOTES ...
Страница 166: ... ...