![Plymovent SBT-Pneumatic SBTP-6-100-100 Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/plymovent/sbt-pneumatic-sbtp-6-100-100/sbt-pneumatic-sbtp-6-100-100_product-user-manual_1569244019.webp)
4
1
3
5
5
2
6
PUM_SBT_091102_EN
19/38
SIDE VIEW
BACK VIEW
WALL SUPPORT MOUNTING PROCEDURE
1.
SBT-Profile
2.
Horizontal wall support
3.
Mounting clamp
4.
Carriage bolts M10x30 with washers and locking
nuts
5.
Nuts M10 with clamp for adjustment of height and
side to side.
6.
Disconnect valve bracket.
a) Cut the Horizontal wall support(2) to the correct
length and follow the same steps as indicated in the
suspension mounting procedure for installing the
wall brackets.
b) Fix the mounting clamp (3) with two M10x30 bolts (4)
to the SBT-Profile (1). Also insert the mounting clamp
for the hose bracket (see hose connection mounting
procedure). Next to this insert the disconnect valve
bracket (6) between the first and second suspension leg.
c) Profile(1) with mounting clamps (3) and supports (2) are
mounted together with washers and locking nuts M10.
c) The nuts (5) are loosened to adjust the track vertical
and horizontal.
8.
INSTALLATION
WARNING
PRODUCT MAY CONTAIN SHARP EDGES
Use care when servicing unit. Failure to do so could
result in minor personal injury.
CAUTION
Before lifting the rail be sure that, the trolley is fixed
in its place, using both end stops. This to avoid injury
when trolley moves if the rail is uneven lifted.