
1000 mm
50 mm / 2”
1
2
3
BAY DOOR
140 Kg/Bolt
140 Kg/Bolt
120 Kg/Bolt
PUM_SBT_091102_EN
13/38
SIDE VIEW
VERTICAL SUPPORT LOCATION
1.
Front support:
2.
Rear support:
3.
Additional support(s)
1) The position of the front support (1) is determined first.
The door is the initial point for the location of this.
A open door requires a margin of 50mm / 2” for
the support. Next to this the distance from the front
support to the start of the profile should be not larger
then 1,5m / 5 feet. If this is not possible please use a
wall mounting bracket to attach the front solidly.
2) The rear support (2) is placed approximately
1000 mm / 40” from the rear of the SBT-profile.
3) Depending on the lenght of the SBT track additional
supports have to be mounted. The normal distance
between the supports is approximately 3 meter /
10 feet.
8.
INSTALLATION
WARNING
PRODUCT MAY CONTAIN SHARP EDGES
Use care when servicing unit. Failure to do so could
result in minor personal injury.
ATTENTION!
See side view for minimum load capacity on the
fixing bolts.
CAUTION
Before lifting the rail be sure that, the trolley is fixed
in its place, using both end stops. This to avoid injury
when trolley moves if the rail is uneven lifted.