WALL SUPPORT LOCATION PROCEDURE
1.
SBT-track
2.
Support leg
3.
Additional Brace
1) The position of the SBT track (1) is determined first.
Please see to it that the profile is positioned within the
gap of the open door. The door is the initial point for
the location of this.
2) The support leg (2) is then measured versus the
mounting position at the wall.
3) Depending on the lenght of the SBT track additional
supports have to be mounted. The distance from the
first installation bracket to the front and respectively
the end of the rail should be minimal 1,5m / 5 feet.
The distance between the side of the truck (tailpipe) and
the SBT profile should be maximal 500mm / 20 inch.
8.
INSTALLATION
WARNING
PRODUCT MAY CONTAIN SHARP EDGES
Use care when servicing unit. Failure to do so could
result in minor personal injury.
max 500 mm / 20”
CAUTION
Before lifting the rail be sure that, the trolley is fixed
in its place, using both end stops. This to avoid injury
when trolley moves if the rail is uneven lifted.