Disassembly Procedures (A3)
80
Chapter 6 - Disassembly Guide
Front Case Disassembly Procedures
Procedure to remove SpO
2
module, ECG/Temp connector
assembly, and encoder assembly:
•
SpO
2
module
: remove the three screws located at the corners of the
SpO
2
module and lift off the ground wire and the foil shield. Then pull
the SpO
2
module straight up to disengage it from main PCB.
Note
Important for reassembly: the insulator goes on the non-foil
screw hole. The washers, star-washers, and foil screw holes
should be assembled together.
•
ECG/Temp cable/connector assembly
: unplug the connector from the
main PCB. Remove the screws fastening the ECG connector to the front
case, rotate the temperature connector counter-clockwise to unscrew it
from the fastening nut on outside of the front case.
Disconnect the white cable and move the SpO
2
front connector ground
cable before attempting to disconnect the temperature connector.
•
The encoder assembly
: unplug the connector from the main PCB.
Remove the wheel, as described in step 1A. Use a 9/16” hex socket to
unscrew the fastening nut on the outside of the front case. The encoder
can then be pulled away from the front case.
During reassembly, the ribbon cable should orient towards the PCB, and
after connection, the excess should be fed under the PCB.
Procedure to remove the main PCB:
1. Disconnect the connectors from the main PCB for:
•
Switch panel
•
SpO
2
•
ECG/Temp
•
Encoder
•
LCD (display). Do not cut the tie wrap over the connector, slide it
out of the way to remove the connector.
•
Backlight
Содержание M3921A
Страница 12: ...xii Contents ...
Страница 16: ...Related Documents 4 Introduction ...
Страница 48: ...Safety Tests 36 Performance Verification ...
Страница 72: ...Troubleshooting Guide 60 Chapter 5 Troubleshooting ...
Страница 99: ...Disassembly Procedures A3 Chapter 6 Disassembly Guide 87 NiBP pump assembly Main PCB Main ribbon cable ...
Страница 100: ...Disassembly Procedures A3 88 Chapter 6 Disassembly Guide ...
Страница 102: ...Top Level Assembly 90 Chapter 7 Spare Parts Top Level Assembly Figure 1 A1 Top Level Assembly Drawing 1 of 2 ...
Страница 103: ...Top Level Assembly Chapter 7 Spare Parts 91 Figure 2 A1 Top Level Assembly Drawing 2 of 2 ...
Страница 105: ...Top Level Assembly Chapter 7 Spare Parts 93 Figure 3 A3 Top Level Assembly Drawing ...
Страница 107: ...Front Case Assembly Chapter 7 Spare Parts 95 Front Case Assembly Figure 4 A1 Front Case Assembly Drawing 1 of 3 ...
Страница 108: ...Front Case Assembly 96 Chapter 7 Spare Parts Figure 5 A1 Front Case Assembly Drawing 2 of 3 ...
Страница 110: ...Front Case Assembly 98 Chapter 7 Spare Parts Figure 7 A3 Front Case Assembly Drawing 1 of 2 ...
Страница 111: ...Front Case Assembly Chapter 7 Spare Parts 99 Figure 8 A3 Front Case Assembly Drawing 2 of 2 ...
Страница 114: ...Rear Case Assembly 102 Chapter 7 Spare Parts Figure 9 A3 Rear Case Assembly Drawing 1 of 3 ...
Страница 115: ...Rear Case Assembly Chapter 7 Spare Parts 103 Figure 10 A3 Rear Case Assembly Drawing 2 of 3 ...
Страница 116: ...Rear Case Assembly 104 Chapter 7 Spare Parts Figure 11 A3 Rear Case Assembly Drawing 3 of 3 ...
Страница 124: ...Repacking In A Different Carton 112 Chapter 8 Packing For Shipment ...
Страница 132: ...Theory of Operation and System Architecture 120 Chapter 10 Training Program Block Diagram A1 Figure 1 A1 Block Diagram ...
Страница 144: ...Preventative Maintenance 132 Chapter 10 Training Program ...
Страница 150: ......