Troubleshooting Guide
58
Chapter 5 - Troubleshooting
Operational Performance
Operational
Performance
Problems - A1
The following lists recommended actions to address problems related to
operational performance of the A1.
Operational
Performance
Problems - A3
The following lists recommended actions to address problems related to
operational performance of the A3.
Condition
Recommended Action
1. The monitor appears to
be operational, but the
physiological values are
suspect or nonexistent.
1. Replace each patient cable (or tubing) with a
known good cable.
2. Ensure that the Patient Connector PCB is
properly connected to the Main PCB. Ensure that
the tubing in the pneumatic system are properly
connected, and that the NiBP pump motor is
connected to the Rear Connector PCB.
3. If the problem persists, replace the Patient
Connector PCB.
4. If the problem persists, replace Main PCB.
Condition
Recommended Action
1. Monitor appears to be
operational, but
physiological values are
suspect or nonexistent.
1. Replace each patient cable (or tubing) with a
known serviceable cable.
2. Ensure internal ECG, temperature, and SpO2
cables are connected to Main PCB. Ensure tubing
in pneumatic system are properly connected, and
NiBP pump motor is connected to power supply
PCB.
3. If problem persists, replace main PCB.
2. Recorder paper will not
advance.
1. Open recorder door and check paper is present.
Press recorder module firmly into monitor to
ensure recorder module is fully engaged with
connector on recorder PCB.
2. Cycle power on monitor. Recorder should execute
a line feed at conclusion of power-up sequence.
3. If problem persists, ensure main ribbon cable is
connected to printer PCB, power supply and Main
PCB.
4. If problem persists, replace recorder.
5. If problem persists, replace recorder PCB.
6. If problem persists, replace Main PCB.
Содержание M3921A
Страница 12: ...xii Contents ...
Страница 16: ...Related Documents 4 Introduction ...
Страница 48: ...Safety Tests 36 Performance Verification ...
Страница 72: ...Troubleshooting Guide 60 Chapter 5 Troubleshooting ...
Страница 99: ...Disassembly Procedures A3 Chapter 6 Disassembly Guide 87 NiBP pump assembly Main PCB Main ribbon cable ...
Страница 100: ...Disassembly Procedures A3 88 Chapter 6 Disassembly Guide ...
Страница 102: ...Top Level Assembly 90 Chapter 7 Spare Parts Top Level Assembly Figure 1 A1 Top Level Assembly Drawing 1 of 2 ...
Страница 103: ...Top Level Assembly Chapter 7 Spare Parts 91 Figure 2 A1 Top Level Assembly Drawing 2 of 2 ...
Страница 105: ...Top Level Assembly Chapter 7 Spare Parts 93 Figure 3 A3 Top Level Assembly Drawing ...
Страница 107: ...Front Case Assembly Chapter 7 Spare Parts 95 Front Case Assembly Figure 4 A1 Front Case Assembly Drawing 1 of 3 ...
Страница 108: ...Front Case Assembly 96 Chapter 7 Spare Parts Figure 5 A1 Front Case Assembly Drawing 2 of 3 ...
Страница 110: ...Front Case Assembly 98 Chapter 7 Spare Parts Figure 7 A3 Front Case Assembly Drawing 1 of 2 ...
Страница 111: ...Front Case Assembly Chapter 7 Spare Parts 99 Figure 8 A3 Front Case Assembly Drawing 2 of 2 ...
Страница 114: ...Rear Case Assembly 102 Chapter 7 Spare Parts Figure 9 A3 Rear Case Assembly Drawing 1 of 3 ...
Страница 115: ...Rear Case Assembly Chapter 7 Spare Parts 103 Figure 10 A3 Rear Case Assembly Drawing 2 of 3 ...
Страница 116: ...Rear Case Assembly 104 Chapter 7 Spare Parts Figure 11 A3 Rear Case Assembly Drawing 3 of 3 ...
Страница 124: ...Repacking In A Different Carton 112 Chapter 8 Packing For Shipment ...
Страница 132: ...Theory of Operation and System Architecture 120 Chapter 10 Training Program Block Diagram A1 Figure 1 A1 Block Diagram ...
Страница 144: ...Preventative Maintenance 132 Chapter 10 Training Program ...
Страница 150: ......