Test And Inspection Matrix
8
Performance Verification
Test And Inspection Matrix
The following test map shows which tests are required in which situations.
Table 1
Test Map
Service Event (When
Performing…)
Test Blocks Required (…Complete
these Tests)
Installation
Visual and Power On Tests
Repairs
A. Unit Exchange
Visual and Power On Tests
B. Unit Opened
Power On Test
Basic Pneumatic Leakage Test (BPL)
Ground Integrity Test
Leakage Current Test
C. NBP Pump replaced
Power On Test
NBP Tests:
Pneumatic Leakage and Inflation Rate
D. SpO
2
Module replaced
Power On Test
BPL Test
SpO
2
Tests:
Dynamic Operating Range and
LED Excitation
E. Front End Connectors replaced
Power On Test
BPL Test
Performance test for the parameter that had
the connector replaced.
F. Power Supply replaced (A3 only)
Power On, BPL, and Safety tests
G. Component level repair on any
PC board
Power On Test
All Performance Tests
All Safety Tests
H. Main PC board replaced
Power On Test
All Performance tests except Battery
Charge Test and Battery Performance Test
All software upgrades
Power On
Preventative maintenance
Power On and NBP Performance Tests
Содержание M3921A
Страница 12: ...xii Contents ...
Страница 16: ...Related Documents 4 Introduction ...
Страница 48: ...Safety Tests 36 Performance Verification ...
Страница 72: ...Troubleshooting Guide 60 Chapter 5 Troubleshooting ...
Страница 99: ...Disassembly Procedures A3 Chapter 6 Disassembly Guide 87 NiBP pump assembly Main PCB Main ribbon cable ...
Страница 100: ...Disassembly Procedures A3 88 Chapter 6 Disassembly Guide ...
Страница 102: ...Top Level Assembly 90 Chapter 7 Spare Parts Top Level Assembly Figure 1 A1 Top Level Assembly Drawing 1 of 2 ...
Страница 103: ...Top Level Assembly Chapter 7 Spare Parts 91 Figure 2 A1 Top Level Assembly Drawing 2 of 2 ...
Страница 105: ...Top Level Assembly Chapter 7 Spare Parts 93 Figure 3 A3 Top Level Assembly Drawing ...
Страница 107: ...Front Case Assembly Chapter 7 Spare Parts 95 Front Case Assembly Figure 4 A1 Front Case Assembly Drawing 1 of 3 ...
Страница 108: ...Front Case Assembly 96 Chapter 7 Spare Parts Figure 5 A1 Front Case Assembly Drawing 2 of 3 ...
Страница 110: ...Front Case Assembly 98 Chapter 7 Spare Parts Figure 7 A3 Front Case Assembly Drawing 1 of 2 ...
Страница 111: ...Front Case Assembly Chapter 7 Spare Parts 99 Figure 8 A3 Front Case Assembly Drawing 2 of 2 ...
Страница 114: ...Rear Case Assembly 102 Chapter 7 Spare Parts Figure 9 A3 Rear Case Assembly Drawing 1 of 3 ...
Страница 115: ...Rear Case Assembly Chapter 7 Spare Parts 103 Figure 10 A3 Rear Case Assembly Drawing 2 of 3 ...
Страница 116: ...Rear Case Assembly 104 Chapter 7 Spare Parts Figure 11 A3 Rear Case Assembly Drawing 3 of 3 ...
Страница 124: ...Repacking In A Different Carton 112 Chapter 8 Packing For Shipment ...
Страница 132: ...Theory of Operation and System Architecture 120 Chapter 10 Training Program Block Diagram A1 Figure 1 A1 Block Diagram ...
Страница 144: ...Preventative Maintenance 132 Chapter 10 Training Program ...
Страница 150: ......