Hardware and Software Tests
Performance Verification
21
1. Confirm that the Bio-Tek simulator is in test mode. The simulator should display
Pressure Gauge
.
2. Confirm that the simulator is set up for the internal cuff.
3. Confirm that the NiBP Test screen is active on the monitor.
•
On the A1, press, then release, the Heart Rate Tone
VOLUME
button
to verify that the valve is closed.
•
On the A3, press the
ALARM SILENCE
button
to ensure that
both valves are closed.
4. Perform an offset adjustment so that the simulator and monitor both display a
pressure of 0 mmHg by doing the following:
a.
Press the
CONTRAST
button on the monitor.
b. Press the
ZERO
button on the simulator.
5. Press the
SELECT
button on the simulator until the simulator displays
Pressure Source Set Test Pressure
.
6. Use the
UP/DOWN
buttons on the simulator to adjust for a pressure of 250
mmHg.
7. Press the
START PUMP
button on the simulator. The simulator begins to
pressurize. The current pressure in mmHg is displayed on both the simulator and
the monitor displays.
8. Allow 15-20 seconds for the pressure to stabilize.
The pressure displayed on the monitor and the simulator should be within 5
mmHg of one another to complete the test successfully.
9. Press the
STOP PUMP
button on the simulator to stop the test.
10. Press and hold the Heart Rate Tone
VOLUME
button
until the monitor
displays a pressure of 0 mmHg.
Additional NiBP tests can be performed at this time. If no further NiBP tests
are to be conducted, turn the monitor off. Normal monitoring operation
returns the next time the monitor is turned on.
Содержание M3921A
Страница 12: ...xii Contents ...
Страница 16: ...Related Documents 4 Introduction ...
Страница 48: ...Safety Tests 36 Performance Verification ...
Страница 72: ...Troubleshooting Guide 60 Chapter 5 Troubleshooting ...
Страница 99: ...Disassembly Procedures A3 Chapter 6 Disassembly Guide 87 NiBP pump assembly Main PCB Main ribbon cable ...
Страница 100: ...Disassembly Procedures A3 88 Chapter 6 Disassembly Guide ...
Страница 102: ...Top Level Assembly 90 Chapter 7 Spare Parts Top Level Assembly Figure 1 A1 Top Level Assembly Drawing 1 of 2 ...
Страница 103: ...Top Level Assembly Chapter 7 Spare Parts 91 Figure 2 A1 Top Level Assembly Drawing 2 of 2 ...
Страница 105: ...Top Level Assembly Chapter 7 Spare Parts 93 Figure 3 A3 Top Level Assembly Drawing ...
Страница 107: ...Front Case Assembly Chapter 7 Spare Parts 95 Front Case Assembly Figure 4 A1 Front Case Assembly Drawing 1 of 3 ...
Страница 108: ...Front Case Assembly 96 Chapter 7 Spare Parts Figure 5 A1 Front Case Assembly Drawing 2 of 3 ...
Страница 110: ...Front Case Assembly 98 Chapter 7 Spare Parts Figure 7 A3 Front Case Assembly Drawing 1 of 2 ...
Страница 111: ...Front Case Assembly Chapter 7 Spare Parts 99 Figure 8 A3 Front Case Assembly Drawing 2 of 2 ...
Страница 114: ...Rear Case Assembly 102 Chapter 7 Spare Parts Figure 9 A3 Rear Case Assembly Drawing 1 of 3 ...
Страница 115: ...Rear Case Assembly Chapter 7 Spare Parts 103 Figure 10 A3 Rear Case Assembly Drawing 2 of 3 ...
Страница 116: ...Rear Case Assembly 104 Chapter 7 Spare Parts Figure 11 A3 Rear Case Assembly Drawing 3 of 3 ...
Страница 124: ...Repacking In A Different Carton 112 Chapter 8 Packing For Shipment ...
Страница 132: ...Theory of Operation and System Architecture 120 Chapter 10 Training Program Block Diagram A1 Figure 1 A1 Block Diagram ...
Страница 144: ...Preventative Maintenance 132 Chapter 10 Training Program ...
Страница 150: ......