Diagnostic Mode
44
Power-up Defaults Menu And Diagnostic Mode
An NiBP Test screen is provided to facilitate troubleshooting problems and
performing verification testing for the NiBP subsystem. Typically, when these tests
are performed, the pneumatic system is connected to an external pressure-reading
device and a closed reference volume. The NiBP Test screen provides a real-time
numeric display of the pressure in the pneumatic system, means for controlling the
pump and valves, and a display indicating whether the proportional and safety valves
are open or closed.
The NiBP Test screen elements are described below:
•
Pressure Display:
The real-time value of the system pneumatic
pressure is displayed in mmHg. The value is
updated at the rate of approximately two times per
second.
•
Proportional Valve
The display indicates whether the
Display:
proportional valve is open or closed.
•
Safety Valve Display:
The display indicates whether the safety valve is
open or closed.
•
Activate Pump:
For as long as the NiBP Start/Stop button
is pressed, the pump runs. If system pressure
reaches the hardware over-pressure protection point
(280 to 330 mmHg), the safety valve opens and the
pump disables, until the pressure falls below the
safety threshold.
•
Deflate:
For as long as the
ALARM SILENCE
button
NiBP TEST
Pressure (mmHg)
179
Valve:
OPEN
Press
NiBP
to activate pump;
release to stop pump.
Press
Volume
to open valve;
release to close valve.
Press
Alarm Silence
to open
proportional valve and deflate at
3 mmHg/s; release to close valve.
Press
Contrast
to perform offset
adjust.
Return
Содержание M3921A
Страница 12: ...xii Contents ...
Страница 16: ...Related Documents 4 Introduction ...
Страница 48: ...Safety Tests 36 Performance Verification ...
Страница 72: ...Troubleshooting Guide 60 Chapter 5 Troubleshooting ...
Страница 99: ...Disassembly Procedures A3 Chapter 6 Disassembly Guide 87 NiBP pump assembly Main PCB Main ribbon cable ...
Страница 100: ...Disassembly Procedures A3 88 Chapter 6 Disassembly Guide ...
Страница 102: ...Top Level Assembly 90 Chapter 7 Spare Parts Top Level Assembly Figure 1 A1 Top Level Assembly Drawing 1 of 2 ...
Страница 103: ...Top Level Assembly Chapter 7 Spare Parts 91 Figure 2 A1 Top Level Assembly Drawing 2 of 2 ...
Страница 105: ...Top Level Assembly Chapter 7 Spare Parts 93 Figure 3 A3 Top Level Assembly Drawing ...
Страница 107: ...Front Case Assembly Chapter 7 Spare Parts 95 Front Case Assembly Figure 4 A1 Front Case Assembly Drawing 1 of 3 ...
Страница 108: ...Front Case Assembly 96 Chapter 7 Spare Parts Figure 5 A1 Front Case Assembly Drawing 2 of 3 ...
Страница 110: ...Front Case Assembly 98 Chapter 7 Spare Parts Figure 7 A3 Front Case Assembly Drawing 1 of 2 ...
Страница 111: ...Front Case Assembly Chapter 7 Spare Parts 99 Figure 8 A3 Front Case Assembly Drawing 2 of 2 ...
Страница 114: ...Rear Case Assembly 102 Chapter 7 Spare Parts Figure 9 A3 Rear Case Assembly Drawing 1 of 3 ...
Страница 115: ...Rear Case Assembly Chapter 7 Spare Parts 103 Figure 10 A3 Rear Case Assembly Drawing 2 of 3 ...
Страница 116: ...Rear Case Assembly 104 Chapter 7 Spare Parts Figure 11 A3 Rear Case Assembly Drawing 3 of 3 ...
Страница 124: ...Repacking In A Different Carton 112 Chapter 8 Packing For Shipment ...
Страница 132: ...Theory of Operation and System Architecture 120 Chapter 10 Training Program Block Diagram A1 Figure 1 A1 Block Diagram ...
Страница 144: ...Preventative Maintenance 132 Chapter 10 Training Program ...
Страница 150: ......