
Installing the power supplies
31
Model 1001MC Operations Guide
2 • Hardware installation
Figure 7
shows the bit setting to configure the address.
Table 9
shows examples of address settings.
Figure 8.
Bit setting to configure the address
Installing the power supplies
Refer to the installation manual that came with the power supply (or supplies) to install the supply and rear
power entry module into the rack chassis.
Verifying 1001MC functioning
1.
Apply power to the rack system, verify that the green
Power
LED on the Model 1001MC front card illumi-
nates.
2.
Turn off power to the rack system, verify that the green
Power
LED on the Model 1001MC front card
extinguishes.
Table 10. Examples of address settings
Hex Address
(Decimal Address)
S3-8 S3-7 S3-6 S3-5 S3-4 S3-3 S3-2 S3-1
0x01 (1)
ON
ON
ON
ON
ON
ON
ON
OFF
0x02 (2)
ON
ON
ON
ON
ON
ON
OFF
ON
0x10(16)
ON
ON
ON
OFF
ON
ON
ON
ON
0xB5(181)
OFF
ON
OFF
OFF
ON
OFF
ON
OFF
Содержание NetLink 1001MC
Страница 10: ...10 Chapter 1 Introduction Chapter contents Introduction 11 Model 1001MC management overview 14...
Страница 43: ...Saving HTTP HTML object changes 43 Model 1001MC Operations Guide 3 Getting started Figure 18 1001MC command map...
Страница 232: ...About 1001MC 232 Model 1001MC Operations Guide 10 HTTP HTML web page reference Figure 113 System Level Information page...