OPERATOR’S
SECTION
L-B B5L0082/PAT 031-300-190-015 REVISION D 04/15/99
1
Table of Contents
OPERATOR’S SECTION
CALIBRATION SECTION
3.1
P
RIOR TO POWERING UP THE SYSTEM VERIFY ALL WIRING
. A
LL UNUSED CHANNELS MUST BE OCCUPIED WITH
DUMMY SIGNALS MEETING THE FOLLOWING REQUIREMENTS
........................................................................................ 25
3.1
M
ECHANICALLY SET THE LENGTH AND ANGLE SENSORS AS FOLLOWS
: (S
EE
A
PPENDIX
A. M
ECHANICAL
Setting the line rider output voltage
. ............................................................................................. 28