EI65 OPERATOR’S AND CALIBRATION MANUAL
L-B B5L0082/PAT 031-300-190-015 REVISION D 04/15/99
8
13 Display
The Display (13) will show technical information as well as operating information and
instructions for the operator.
120.0
112000lbs
88.5
81.0
47.5
16
During crane operation the readout will display the actual load, the tip height, the boom
length, the boom angle, the working radius, the selected hoist winch and the number of
reevings (parts of line). In case of a system error an error code is displayed in place of the
reevings.
During the setting procedure of the Operating Conditions and the limit setting procedure the
display shows the setting values and information for the operator.
4 PROGRAMMING PROCEDURE
During the startup phase the PAT System EI 65 automatically starts with a programming
procedure which relies on the correct entry by the crane operator.
This procedure consists of three parts:
•
Startup Procedure
•
Setting operating configuration of the crane
•
Setting the preset limits
For simple operation, the computer guides the operator through the procedure step by step.
The operator has to read the information displayed and is instructed to answer questions by
using appropriate buttons of the keyboard. During each step of the procedure particular
button lights will come on to identify the possible choices for the step.
4.1 Startup Procedure
After ignition of the engine the system starts the Startup Procedure with a self test.
During the Startup Procedure the crane operator will confirm the preset configuration stored
in system memory as described below. The operator will compare the preset operating
configuration values with the actual crane configuration.