OPERATOR’S SECTION
L-B B5L0082/PAT 031-300-190-015 REVISION D 04/15/99
11
Note: Jib 2 is an extension with fixed length and with different offset angles.
STEP 8
The previously programmed or default offset angle of jib 2 is
displayed.
To enter a new offset angle, the operator has to select the value by pushing the buttons “UP”
(12) or “DOWN” (11).
If the operator wants to continue with the displayed offset angle of jib he has to confirm by
pushing the button “OK” (10).
Push Button “OK” (10) for next step.
STEP 9
If the main boom length is correct, push the button “DOWN” (11). To
change the main boom length the button OK (10) has to be pressed.
Confirm jib values entered in Steps 6 to 9, by pressing the button “OK”.
STEP 10
Step 11 will be skipped, if the crane is not equipped with an Auxiliary
Hoist.
The crane operator is requested to enter the actual hoist winch.
Push Button “OK” (10) for next step.
If the operator wants to continue with the previously used or default hoist he has to push
button “DOWN” (11).
Step 11 will be skipped, when the button “DOWN” is pressed.
STEP 11
To select either the Main Hoist or the Auxiliary Hoist the operator
has to use the button “DOWN” (11).
If the operator wants to continue with the displayed hoist he has to
confirm by pushing the button “OK” (10).
Push Button “OK” (10) for next step.
STEP 12
The crane operator is requested to enter the number of reevings
(parts of line) being used.
JIB OFFSET_2: 15
PUSH
↓↑
OR OK
MAIN BOOM?
PUSH
↓
OR OK
HOIST SELECT?
PUSH
↓
OR OK
MAIN HOIST?
PUSH
↓
OR OK
AUXILIARY HOIST?
PUSH
↓
OR OK
REEVING?
PUSH
↓
OR OK