
INSTALLATION
28
Parker Automation Controller Installation Guide
Removing the Controller
To remove the PAC Controller from the DIN rail:
1.
Push the module up and against the metal spring located on the underside of the rail guide.
2.
Tip the module away from the rail as shown in the illustration.
3.
Pull the module down and out of the mounting rail.
Adding PACIO Modules
WARNING: Always attach or remove PACIO Modules with the system in a powered-
down state. Damage to the modules or unintended I/O functionality
might occur.
Earth Ground
Just as with the PAC Controller, connect the PACIO Modules to Earth by attaching the metal housing to
operative Earth via the grounded DIN rail.
Содержание PAC
Страница 11: ...CHAPTER 1 Product Overview...
Страница 18: ......
Страница 19: ...CHAPTER 2 Installation...
Страница 33: ...CHAPTER 3 System Start up and Configuration...
Страница 69: ...CHAPTER 4 PACIO Modules...
Страница 143: ...2 After adding the device and code to the project you will configure the IO map as displayed...
Страница 155: ...PAC with 400XR series...
Страница 156: ...PACIO MODULES 156 Parker Automation Controller Installation Guide...
Страница 157: ...PAC with 400LXR...
Страница 158: ...PACIO MODULES 158 Parker Automation Controller Installation Guide PAC with SMH sensors...
Страница 159: ...CHAPTER 5 Communication Interfaces Optional...
Страница 176: ......
Страница 177: ...CHAPTER 6 Troubleshooting...
Страница 188: ...TROUBLESHOOTING 188 Parker Automation Controller Installation Guide...
Страница 189: ...APPENDIX A PAC System Specifications...
Страница 195: ...APPENDIX B Additional Information...