
3.3.4 Installation
Environment
Installation Environment
Avoid installing the LightPixAE20 in the following locations:
Locations with direct sunlight or environmental temperatures exceeding a range of 0ºC to +40ºC.
Locations with a relative humidity exceeding a range of 35%RH to 85%RH (without dew condensation
at 25ºC)
Locations with a lot of fine particles, iron filings, salt, oily smoke or conductive dusts
Locations with a lot of dusts, oily smoke, conductive dusts, or corrosive or flammable gases
Locations where the product can contact oil or chemicals
Locations near organic solvents (such as benzene, paint thinner, and alcohol) or strongly alkaline
materials (such as ammonia and caustic soda)
Locations within 100mm of high-voltage wires (or devices), power-driven lines (or devices), radios,
transmitters and devices generating large switching surge (be sure to keep more than 100mm space
between the LightPixAE20 and these devices)
Noise Countermeasure
Do not bundle the optional cable connecting between the main unit and the operation unit, and input
/output signal cables connecting to the main unit together with motor or power cables. Ensure that they
are at least 100m apart. Keep the signal cables as short as possible.
If the external devices connected to the main unit are connected with directive conduction load (a motor
or relay), equip noise-absorbing elements such as noise killers at the load side.
Lighting equipment for image process generates signal of extremely high level due to high frequency
lighting. If you use external lighting, arrange the wiring of power transmission and signal cables
carefully.
Countermeasure for Heat Radiation
When installing the operation unit (or the operation unit with finder unit), set the device in the following
direction for heat radiation.
Correct Wrong
20
Содержание LightPix AE20
Страница 1: ...http www nais e com vision Panasonic the new name for Matsushita Electric Works Ltd User s Manual ...
Страница 8: ...Chapter 1 Overview of Light Pix AE20 1 ...
Страница 12: ...Chapter 2 Names and Functions of Parts 5 ...
Страница 18: ...Chapter 3 Installation and Wiring 11 ...
Страница 36: ...Chapter 4 Inspection Applications 29 ...
Страница 106: ...Section 5 Parallel Communication 99 ...
Страница 113: ...Section 6 RS 232C Communication 107 ...
Страница 138: ...Section 7 About AETOOL and GT11 133 ...
Страница 143: ...Section 8 General Specifications Product Numbers and Dimensions 139 ...
Страница 148: ...Mounting plate Operation unit 144 ...
Страница 149: ...Finder unit 145 ...
Страница 150: ...Record of Changes Manual No Date Descriptions ARCT1F406E May 2005 First Edition 146 ...
Страница 151: ...ARCT1F406E 200505 P 2005 ...