5-6
5.1.6
93B
Procedure 5: Checking Rotating and Moving Directions and Moving
Distance
Check whether the rotating and moving direction of the motor and the moving distance is correct or not.
The operations can be easily confirmed using the tool operation function of the Configurator PM without
ladder programs.
1. Confirm the rotating direction and moving direction of the motor by the JOG operation. Select the
“Online”
→
“Tool operation” on the menu of the Configurator PM, and make the servo on for the
corresponding axis to execute the JOG operation. When using the ladder program, turn on the forward
JOG and reverse contact after turning on the servo on contact.
The rotating direction is determined according to the installation of the ball screw or the “CW/CCW
direction setting” of the parameter.
2. Confirm whether the moving distance is as designed or not by the position control. Set the table 1 of
the positioning data using the Configurator PM, and select the “Online”
→
“Tool operation” on the
menu of the Configurator PM after downloading the table to the positioning unit RTEX, and make the
servo on for the corresponding axis to execute the JOG operation. When using the ladder program,
set the position control starting table, and then turn on the positioning start contact after turning on the
servo on contact.
The moving distance is determined according to the pitch of the ball screw, deceleration gear rate or
setting movement amount of the positioning data.
Note) Execute the servo on, and make the AMP under the condition that the servo is locked before
performing the JOG operation and position control.
Содержание FP2 Positioning Unit RTEX
Страница 1: ......
Страница 6: ...iv ...
Страница 14: ...xii ...
Страница 15: ...Chapter 1 Functions of Unit and Restrictions on Combination ...
Страница 21: ...Chapter 2 Parts and Functions ...
Страница 22: ...2 2 2 1 Parts and Functions FPΣ Positioning Unit RTEX FP2 Positioning Unit RTEX ...
Страница 24: ...2 4 ...
Страница 25: ...Chapter 3 Wiring ...
Страница 27: ...3 3 3 2 Network Connector RJ45 plug is connected to the network connector Pins of RJ45 plug Connecting diagram ...
Страница 31: ...Chapter 4 Power On Off and Items to Check ...
Страница 36: ...4 6 ...
Страница 37: ...Chapter 5 4BPreparation For Operation ...
Страница 45: ...Chapter 6 5BI O Allocation ...
Страница 53: ...Chapter 7 6BSetting Tool Configurator PM ...
Страница 83: ...7 31 Setting Font Select Option Font in the menu bar The following dialog is shown ...
Страница 102: ...7 50 ...
Страница 103: ...Chapter 8 7BAutomatic Operation Position Control ...
Страница 118: ...8 16 ...
Страница 119: ...8 17 When the X axis and Y axis is the moving axes each axis in the above diagram is replaced ...
Страница 141: ...Chapter 9 8BManual Operation JOG Operation ...
Страница 146: ...9 6 ...
Страница 147: ...Chapter 10 9BManual Operation Home Return ...
Страница 155: ...Chapter 11 10BManual Operation Pulser Operation ...
Страница 159: ...Chapter 12 11BStop Functions ...
Страница 162: ...12 4 ...
Страница 163: ...Chapter 13 12BSupplementary Functions ...
Страница 177: ...13 15 Sample program When reading AMP parameter No 1 1 of axis 1 with A6N or A5N ...
Страница 179: ...13 17 Sample program When writing AMP parameter No 1 1 of axis 1 with A6N or A5N ...
Страница 183: ...Chapter 14 Precautions During Programming ...
Страница 187: ...Chapter 15 Errors and Warnings ...
Страница 212: ...15 26 ...
Страница 213: ...Chapter 16 Troubleshooting ...
Страница 214: ...16 2 16 1 Cannot Communication With AMP ...
Страница 215: ...Chapter 17 Specifications ...
Страница 275: ...Chapter 18 Dimensions ...
Страница 276: ...18 2 18 1 FPSigma Positioning Unit RTEX ...
Страница 277: ...18 3 18 2 FP2 Positioning Unit RTEX ...
Страница 278: ...18 4 ...
Страница 279: ...Chapter 19 Sample Programs ...
Страница 283: ...19 5 ...
Страница 286: ...19 8 ...
Страница 288: ......