8-26
Operation diagram
Operations of each contact
•
The BUSY flag for the axes 1, 2 and 3 (FP
Σ
: X118, X119, X11A, FP2: X18, X19, X1A) indicating the
state that a motor is running turns on when the position control started, and it turns off when the
operation completed.
•
The operation done flag for the axes 1, 2 and 3 (FP
Σ
: X120, X121, X122, FP2: X20, X21, X22)
indicating the state that an operation completed turns on when the position control completed, and it
will be held until any operation among the position control, JOG operation, home return and pulser
operation starts. The timing of that the flag turns on is at the time that the current value of the AMP
became within the completion width specified in the parameter setting of the Configurator PM after
sending the command to move to the target position.
Содержание FP2 Positioning Unit RTEX
Страница 1: ......
Страница 6: ...iv ...
Страница 14: ...xii ...
Страница 15: ...Chapter 1 Functions of Unit and Restrictions on Combination ...
Страница 21: ...Chapter 2 Parts and Functions ...
Страница 22: ...2 2 2 1 Parts and Functions FPΣ Positioning Unit RTEX FP2 Positioning Unit RTEX ...
Страница 24: ...2 4 ...
Страница 25: ...Chapter 3 Wiring ...
Страница 27: ...3 3 3 2 Network Connector RJ45 plug is connected to the network connector Pins of RJ45 plug Connecting diagram ...
Страница 31: ...Chapter 4 Power On Off and Items to Check ...
Страница 36: ...4 6 ...
Страница 37: ...Chapter 5 4BPreparation For Operation ...
Страница 45: ...Chapter 6 5BI O Allocation ...
Страница 53: ...Chapter 7 6BSetting Tool Configurator PM ...
Страница 83: ...7 31 Setting Font Select Option Font in the menu bar The following dialog is shown ...
Страница 102: ...7 50 ...
Страница 103: ...Chapter 8 7BAutomatic Operation Position Control ...
Страница 118: ...8 16 ...
Страница 119: ...8 17 When the X axis and Y axis is the moving axes each axis in the above diagram is replaced ...
Страница 141: ...Chapter 9 8BManual Operation JOG Operation ...
Страница 146: ...9 6 ...
Страница 147: ...Chapter 10 9BManual Operation Home Return ...
Страница 155: ...Chapter 11 10BManual Operation Pulser Operation ...
Страница 159: ...Chapter 12 11BStop Functions ...
Страница 162: ...12 4 ...
Страница 163: ...Chapter 13 12BSupplementary Functions ...
Страница 177: ...13 15 Sample program When reading AMP parameter No 1 1 of axis 1 with A6N or A5N ...
Страница 179: ...13 17 Sample program When writing AMP parameter No 1 1 of axis 1 with A6N or A5N ...
Страница 183: ...Chapter 14 Precautions During Programming ...
Страница 187: ...Chapter 15 Errors and Warnings ...
Страница 212: ...15 26 ...
Страница 213: ...Chapter 16 Troubleshooting ...
Страница 214: ...16 2 16 1 Cannot Communication With AMP ...
Страница 215: ...Chapter 17 Specifications ...
Страница 275: ...Chapter 18 Dimensions ...
Страница 276: ...18 2 18 1 FPSigma Positioning Unit RTEX ...
Страница 277: ...18 3 18 2 FP2 Positioning Unit RTEX ...
Страница 278: ...18 4 ...
Страница 279: ...Chapter 19 Sample Programs ...
Страница 283: ...19 5 ...
Страница 286: ...19 8 ...
Страница 288: ......