13-2
13.1
63B
Dwell Time
The time taken until the next operation after the completion of an executed positioning table in the
automatic operation is called dwell time.
The operations of the dwell time vary according to control methods slightly. Followings are the
operations in each control method.
For E point control
The dwell time is the time taken from the completion of the position command until the operation done
flag turns on.
For P point control
In the P point control, the positioning table operates consecutively, therefore, the dwell time is ignored.
For the last table (E point), as well as the E point control, the dwell time is the time taken from the
completion of the position command until the operation done flag turns on.
For C point control
The dwell time is the waiting time for executing the next table from the completion of the positioning table
(deceleration stop).
For the last table (E point), as well as the E point control, the dwell time is the time taken from the
completion of the position command until the operation done flag turns on.
Содержание FP2 Positioning Unit RTEX
Страница 1: ......
Страница 6: ...iv ...
Страница 14: ...xii ...
Страница 15: ...Chapter 1 Functions of Unit and Restrictions on Combination ...
Страница 21: ...Chapter 2 Parts and Functions ...
Страница 22: ...2 2 2 1 Parts and Functions FPΣ Positioning Unit RTEX FP2 Positioning Unit RTEX ...
Страница 24: ...2 4 ...
Страница 25: ...Chapter 3 Wiring ...
Страница 27: ...3 3 3 2 Network Connector RJ45 plug is connected to the network connector Pins of RJ45 plug Connecting diagram ...
Страница 31: ...Chapter 4 Power On Off and Items to Check ...
Страница 36: ...4 6 ...
Страница 37: ...Chapter 5 4BPreparation For Operation ...
Страница 45: ...Chapter 6 5BI O Allocation ...
Страница 53: ...Chapter 7 6BSetting Tool Configurator PM ...
Страница 83: ...7 31 Setting Font Select Option Font in the menu bar The following dialog is shown ...
Страница 102: ...7 50 ...
Страница 103: ...Chapter 8 7BAutomatic Operation Position Control ...
Страница 118: ...8 16 ...
Страница 119: ...8 17 When the X axis and Y axis is the moving axes each axis in the above diagram is replaced ...
Страница 141: ...Chapter 9 8BManual Operation JOG Operation ...
Страница 146: ...9 6 ...
Страница 147: ...Chapter 10 9BManual Operation Home Return ...
Страница 155: ...Chapter 11 10BManual Operation Pulser Operation ...
Страница 159: ...Chapter 12 11BStop Functions ...
Страница 162: ...12 4 ...
Страница 163: ...Chapter 13 12BSupplementary Functions ...
Страница 177: ...13 15 Sample program When reading AMP parameter No 1 1 of axis 1 with A6N or A5N ...
Страница 179: ...13 17 Sample program When writing AMP parameter No 1 1 of axis 1 with A6N or A5N ...
Страница 183: ...Chapter 14 Precautions During Programming ...
Страница 187: ...Chapter 15 Errors and Warnings ...
Страница 212: ...15 26 ...
Страница 213: ...Chapter 16 Troubleshooting ...
Страница 214: ...16 2 16 1 Cannot Communication With AMP ...
Страница 215: ...Chapter 17 Specifications ...
Страница 275: ...Chapter 18 Dimensions ...
Страница 276: ...18 2 18 1 FPSigma Positioning Unit RTEX ...
Страница 277: ...18 3 18 2 FP2 Positioning Unit RTEX ...
Страница 278: ...18 4 ...
Страница 279: ...Chapter 19 Sample Programs ...
Страница 283: ...19 5 ...
Страница 286: ...19 8 ...
Страница 288: ......