5-376-000094
REV. 3 - 03/10
Section II: Operation
Page 69
WARNING:
Stay clear of rotating equipment to avoid crushing injury.
When making a heavy lift or pull with the wrecker boom, the following steps
should be taken:
1. Position the recovery vehicle as
close as possible to the work and
set the parking brakes and place
the transmission in neutral.
2. Turn “ON” the CONTROL switch
if the remote hand controller is
going to be used.
3. Engage the power take-off
(PTO). See PTO operator’s
instruction manual. Adjust the
electronic or manual throttle
control to elevate the engine
speed to approximately 1000-
1200 rpm of P.T.O. output shaft
speed for optimum performance.
CAUTION:
Never exceed 1200 R.P.M.
When your hook up is complete,
reset the engine idle to normal.
4. Confirm that the recovery vehicle
is positioned properly and rests
on firm ground. The outriggers,
stabilizers and spades can be
lowered to provide additional
support if necessary.