Returning the Server to Operation
These topics describe how to return the server to operation.
Step
Description
Links
1.
Replace the top cover and return the server to its
normal operating position
“Replace the Top Cover” on page 172
“Return the Server to the Normal Operating
2.
Connect the power cords to the server.
“Attach Power Cords” on page 174
3.
Power on the server.
“Power On the Server (System Power
Returning the Server to Operation
171
Содержание SPARC T8-2
Страница 1: ...SPARC T8 2 Server Service Manual Part No E80511 04 June 2019 ...
Страница 2: ......
Страница 10: ...10 SPARC T8 2 Server Service Manual June 2019 ...
Страница 12: ...12 SPARC T8 2 Server Service Manual June 2019 ...
Страница 24: ...Server Block Diagram 24 SPARC T8 2 Server Service Manual June 2019 ...
Страница 26: ...26 SPARC T8 2 Server Service Manual June 2019 ...
Страница 62: ...62 SPARC T8 2 Server Service Manual June 2019 ...
Страница 82: ...82 SPARC T8 2 Server Service Manual June 2019 ...
Страница 110: ...110 SPARC T8 2 Server Service Manual June 2019 ...
Страница 114: ...114 SPARC T8 2 Server Service Manual June 2019 ...
Страница 128: ...128 SPARC T8 2 Server Service Manual June 2019 ...
Страница 135: ...Verify the SPM Related Information Oracle ILOM documentation Install the SPM on page 131 Servicing the SPM 135 ...
Страница 136: ...136 SPARC T8 2 Server Service Manual June 2019 ...
Страница 146: ...146 SPARC T8 2 Server Service Manual June 2019 ...
Страница 164: ...164 SPARC T8 2 Server Service Manual June 2019 ...
Страница 170: ...170 SPARC T8 2 Server Service Manual June 2019 ...
Страница 176: ...176 SPARC T8 2 Server Service Manual June 2019 ...
Страница 182: ...182 SPARC T8 2 Server Service Manual June 2019 ...
Страница 188: ...188 SPARC T8 2 Server Service Manual June 2019 ...