
6.
For both holes in the slide rail flange, place one #10-32 x 5/8” screw through the
flange and into the tapped hole, and screw them into place.
7.
Repeat Steps 2 and 6 for the other test equipment slide rail.
Installing Slide Rails into a Square-Hole Rack
This section explains how to mount the Acme Packet 3900 slide rail assembly into a
square-hole equipment rack. The customer can use #10-32, 1/4-20, M5 or M6 cage
nuts as an alternative, but the cage nuts will be customer-supplied along with the
associated mounting screws for the cage nut selected.
To install the slide rails on the front of a square-hole equipment rack:
1.
Locate the following components:
•
Equipment rack slide rails (2)
•
#10-32 x 5/8” screws (8)
•
Mounting spacers (2)
•
Nut bars (2)
2.
Line up the painted side of the stationary rail with an appropriate mount point on
the front of the equipment rack.
Chapter 3
Cabinet-style 4-Post Chassis Installation
3-7