Operation manual
G9SR
XXVI
PFHd
:
P
robability
F
ailures per
H
our that are
D
angerous
PL:
P
erformance
L
evel as defined in ISO 13849-1
RESTART:
A sequence of the total system to come from a non-powered
situation to an operational situation. In an operational situation
OSSDs can be activated (ON) when a valid input signal is received.
Safe State:
A forced OFF state, the OSSDs are OFF.
SLC
:
S
afety
L
ight
C
urtain.
Содержание G9SR
Страница 1: ...ZX T Series Cat No J12E EN 03 G9SR Safety Relays OPERATION MANUAL G9SR BC G9SR AD G9SR EX...
Страница 34: ...Operation manual G9SR Page 8 of 79 3 1 Test the OFF behaviour...
Страница 35: ...Operation manual G9SR Page 9 of 79 3 2 Test the ON behaviour...
Страница 102: ...Operation manual G9SR Page 76 of 79 My notes...
Страница 105: ...Operation manual G9SR Page 79 of 79 My notes...