Operation manual
G9SR
Page 7 of 79
3
Test
Perform the tests always:
•
after installation
•
after every system maintenance action
•
after a change in settings (dip switches or rotary switches)
•
periodically according to the local requirements
(local standards and/or safety rules)
WARNING! Incorrect testing can cause potentially hazardous situations
which, if not avoided, could result in death or serious injury.
Additionally, there may be severe property damage.
Test procedure:
1.
Test the OFF behaviour. See § 3.1 on page 8
2.
Test the ON behaviour. See § 3.2 on page 9
3.
Log the test results.
See
Appendix B: Logging of test results
on page 77
Содержание G9SR
Страница 1: ...ZX T Series Cat No J12E EN 03 G9SR Safety Relays OPERATION MANUAL G9SR BC G9SR AD G9SR EX...
Страница 34: ...Operation manual G9SR Page 8 of 79 3 1 Test the OFF behaviour...
Страница 35: ...Operation manual G9SR Page 9 of 79 3 2 Test the ON behaviour...
Страница 102: ...Operation manual G9SR Page 76 of 79 My notes...
Страница 105: ...Operation manual G9SR Page 79 of 79 My notes...