![Omron CVM1-CLK21 Скачать руководство пользователя страница 279](http://html1.mh-extra.com/html/omron/cvm1-clk21/cvm1-clk21_operation-manual_742531279.webp)
263
Handling Precautions
Section 9-5
3.
Mount the new Controller Link Unit in the PC and connect the communica-
tions cables. (Refer to SECTION 3.)
4.
Set the unit number, node address, baud rate, and the terminating resis-
tance for the new Unit to the same settings as the previous Unit. (Refer to
SECTION 4.)
5.
Turn on the power to the PCs at all nodes in the Controller Link Network
other than those for which the Controller Link Unit was replaced.
6.
Check that all the other nodes are active and then turn on the power to the
PC with the Controller Link Unit that was replaced.
7.
Using the Controller Link Support Software, read the network parameters
and make sure the Network is operating normally.
8.
If the data links are not activated automatically, start the data links from the
data link startup node.
9.
Check that the data links are operating normally by monitoring them from
the Controller Link Support Software.
Содержание CVM1-CLK21
Страница 2: ......
Страница 3: ......
Страница 4: ...iv...
Страница 6: ...vi...
Страница 33: ...17 Application Precautions Section 1 5 2 9 8 2 2 8 5 2...
Страница 34: ......
Страница 42: ......
Страница 66: ......
Страница 103: ...87 Setting Data Links Section 5 2 Device Information Setting Data Link Tables...
Страница 124: ......
Страница 192: ......
Страница 280: ......
Страница 284: ......
Страница 300: ......
Страница 304: ......