9-2
Transferring Screen Data through the PLC
9-2-2 Procedure
9-10
12. Click the
OK
Button to create the new screen data. The created screen data will
be created in a project file (.ipp extension) for transfer to the NS-series PT.
13. To transfer the screen data to the NS-series PT, select either
Quick Transfer [To
PT]
or
Transfer [To PT]
from the PT menu. The following dialog box will be
displayed for confirmation.
For details on the transfer method, refer to the
CX-Designer User’s Manual
(Cat.
No. V099).
The following flowchart outlines the procedure up to the screen data transfer.
Select the created screen data (project file).
Transfer the project file.
Set the communications path (PC – PLC – PT).
Click the
Connect
Button to start communications with the PT.
Содержание CJ Series
Страница 2: ......
Страница 3: ...CXONE AL C V3 CXONE AL D V3 CX Integrator Ver 2 3 Operation Manual Revised February 2009 ...
Страница 4: ...iv ...
Страница 6: ...vi ...
Страница 18: ...xviii ...
Страница 154: ...Communications Section 3 Routing Tables This section describes how to set the routing tables ...
Страница 189: ...3 3 Maintenance after Network Configuration 3 3 2 Editing the FINS Local Network Tables 3 36 ...
Страница 244: ...Communications Section 5 Ethernet This section describes the operations specific to Ethernet ...
Страница 249: ...5 2 Ping Test 5 2 2 Procedure 5 6 ...
Страница 353: ...7 8 Other CompoNet Functions 7 8 2 Installing Expansion Modules 7 32 ...
Страница 354: ...Communications Section 8 CompoWay F This section explains the settings and operations specific to the CompoWay F system ...
Страница 368: ...Communications Section 9 NT Links This section explains the settings and operations specific to the NT Link system ...
Страница 404: ...Appendices ...
Страница 407: ...A 1 CPS File Management A 1 1 Description of CPS Files A 4 ...
Страница 413: ......
Страница 414: ......
Страница 415: ......