3 Application
Precautions
xxii
3 Application
Precautions
Observe the following precautions when using the CX-Integrator.
General Communications Precautions
•
Do not turn OFF the power to the PLC or disconnect the cable connecting
the PLC when the CX-Integrator is online with the PLC. Doing so may cause
the computer running CX-Integrator to malfunction.
•
Before changing the operating mode, always confirm that doing so will not
adversely affect system operation.
•
Always check the operation of parameters sufficiently before using them for
actual system operation.
•
Confirm that resetting CPU Bus Units and Special I/O Units will not
adversely affect system operation before resetting these Units.
•
Use only the specified communications cables.
•
Do not extend connection distances beyond the ranges given in the
specifications.
•
Take appropriate measures to ensure that the specified power with the rated
voltage and frequency is supplied. Be particularly careful in places where the
power supply is unstable. An incorrect power supply may result in
malfunction.
•
When installing the PLC, ground to 100
Ω
min.
•
Install external breakers and take other safety measures against
short-circuiting in external wiring. Insufficient safety measures against
short-circuiting may result in burning.
•
Check all wiring and switch settings to be sure they are correct before
turning ON the power supply.
•
Check the user programming (e.g., the ladder program) for proper execution
before actually running it on the PLC. Not checking the program may result
in unexpected operation.
DeviceNet
•
Enable the scan list to before operating the system.
•
When adding a new node to the network, make sure that the baud rate is
the same as other nodes.
•
Use specified communications cables.
•
Do not extend connection distances beyond the ranges given in the
specifications.
•
Always turn OFF the power supply to the personal computer, Slaves, and
Communications Units before attempting any of the following.
•
Attaching or detaching the DeviceNet Board or Card
•
Assembling the Units
•
Setting rotary switches
•
Connecting or wiring the cables
•
Connecting or disconnecting connectors
Содержание CJ Series
Страница 2: ......
Страница 3: ...CXONE AL C V3 CXONE AL D V3 CX Integrator Ver 2 3 Operation Manual Revised February 2009 ...
Страница 4: ...iv ...
Страница 6: ...vi ...
Страница 18: ...xviii ...
Страница 154: ...Communications Section 3 Routing Tables This section describes how to set the routing tables ...
Страница 189: ...3 3 Maintenance after Network Configuration 3 3 2 Editing the FINS Local Network Tables 3 36 ...
Страница 244: ...Communications Section 5 Ethernet This section describes the operations specific to Ethernet ...
Страница 249: ...5 2 Ping Test 5 2 2 Procedure 5 6 ...
Страница 353: ...7 8 Other CompoNet Functions 7 8 2 Installing Expansion Modules 7 32 ...
Страница 354: ...Communications Section 8 CompoWay F This section explains the settings and operations specific to the CompoWay F system ...
Страница 368: ...Communications Section 9 NT Links This section explains the settings and operations specific to the NT Link system ...
Страница 404: ...Appendices ...
Страница 407: ...A 1 CPS File Management A 1 1 Description of CPS Files A 4 ...
Страница 413: ......
Страница 414: ......
Страница 415: ......