![background image](http://html1.mh-extra.com/html/omron/3g8f7-crm21/3g8f7-crm21_user-manual_743553209.webp)
189
Preparing and Mounting Flat Connectors on the Cables
Section E-4
3.
Pressure-Welding the Connector
Use a DWT-A01 Special Tool (Pliers) to pressure-weld and connect the cable.
3-1 Align the center (see arrow) of the connector cover with the center of
the pressure-welding block on the DWT-A01 Pliers.
3-2 Squeeze the Pliers firmly until the lock on the Connector clicks into
place.
Note
•
Do not pressure-weld the connector cover at the edge.
•
Do not use the back of pressure-welding block to pressure-weld
the connector cover.
•
Set the Connector in the correct orientation.
3-3 Confirm that it is properly pressure-welded as shown below:
Special Tool (Pliers)
Connector cover
OK
NG
NG
NG
No space here
Содержание 3G8F7-CRM21
Страница 4: ...iv...
Страница 10: ...x TABLE OF CONTENTS...
Страница 30: ...10 Specifications Section 1 7 1 7 3 Dimensions 3G8F7 CRM21 PCI unit mm 3G8F8 CRM21 CompactPCI unit mm...
Страница 46: ...26 Connecting the Communications Power Supply Cables Section 2 4...
Страница 74: ...54 Board Hardware Error Notification Section 4 8...
Страница 173: ...153 APPENDIX D Sample Program D 1 Sample Program 154...
Страница 230: ...210 Wiring for Power Supply Section E 5...
Страница 234: ...214 Index...
Страница 236: ...216 Revision History...
Страница 237: ......