194
Preparing and Mounting Flat Connectors on the Cables
Section E-4
2-2 Hold the Cable to prevent dislocation. Close the cover to sandwich the
Cable.
3.
Pressure-welding the Connector
Use a DWT-A02 Special Tool (Pliers) to pressure-weld and connect the Cable.
3-1 Place the Connector on the pressure-welding block of the DWT-A02
Special Tool (Pliers). Align the Connector side faces with the datum
shown in the picture below (shaded faces). Thus the center (see
arrow) of the connector cover is aligned with the center of the
pressure-welding block on the Pliers.
3-2 Squeeze the Pliers firmly until the lock on the Connector clicks into
place.
Datum to place the
Connector
Special Tool (Pliers)
Connector cover
Содержание 3G8F7-CRM21
Страница 4: ...iv...
Страница 10: ...x TABLE OF CONTENTS...
Страница 30: ...10 Specifications Section 1 7 1 7 3 Dimensions 3G8F7 CRM21 PCI unit mm 3G8F8 CRM21 CompactPCI unit mm...
Страница 46: ...26 Connecting the Communications Power Supply Cables Section 2 4...
Страница 74: ...54 Board Hardware Error Notification Section 4 8...
Страница 173: ...153 APPENDIX D Sample Program D 1 Sample Program 154...
Страница 230: ...210 Wiring for Power Supply Section E 5...
Страница 234: ...214 Index...
Страница 236: ...216 Revision History...
Страница 237: ......