OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
7
1. Set up the test in the software (page 14) or in the onboard display
2.
Create a Test Profile in the software (page 18) or in the onboard display
3. Assemble the test cell (page 40) and run a Drag Check (page 46).
4. Mix the cement slurry.
5. Fill the cell with cement and load it into the heating jacket.
6. Connect the Water Fill Tube to the inlet port on the top of the cell.
Connect the thermocouple to the thermocouple port on the cabinet (page
7. Turn the Water Supply valve to “FILL” and wait for water to come out of
the weep hole on the SGSM magnet cover.
8. When the cell is full, tighten the weep hole and turn the Water Supply
valve to “OPERATE”.
9. Set the “HEAT”, “COOL”, and “PRESSURE” switches to “AUTO”.
10. Click the “Start Test” button in the software or touch the “Start Test” button
on the display.
11. After the test, allow test cell to cool down before removing it (page 50).
12. Disassemble the test cell and clean the cement from the test cell and all
13. Clean and inspect all of the test cell components for damage or wear.
Quick Start
SGSM