OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
58
Maintenance
Maintenance Schedule
Procedure
Schedule
Calibrate Load Cell
- After any mechanical components
are changed (bob, shaft, bushings,
transducer, etc.)
- Monthly
Replace Bushings
- If the bushings show signs of damage
or wear
- When the SGSM Drag Check results
SGSM Drag Check
- Before every test
- After load cell calibration
Bob Measurements
- Every 3 Months
O-ring Replacement
- After 400°F (204.4°C) tests or as
needed
Calibrate Temperature
Calibrate Pressure
Replace Fuses