OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
49
SGSM
Starting the Test
Use of this equipment in a manner not specified by the manufacturer
may impair the protections provided by the equipment.
1. Set up a test in the software (page 14) or in the onboard display (page
2. Create a Test Profile in the software (page 18) or in the onboard display
3. Define any events (page 22) or calculated values (page 23) in the
software.
4. Assemble the test cell (page 40), load it into the heating jacket, and
make all the necessary connections (page 48).
Make sure the thermocouple is not tightened completely.
5. Slowly turn the Water Supply valve to “Fill”.
6. Watch for water to leak from the thermocouple. When the water starts to
leak, immediately tighten the thermocouple with a wrench to seal the cell.
This will ensure that all air has been purged from the cell.
7. Turn the Water Supply valve to “OPERATE”.
8. Set the “HEAT”, “COOL”, and “PRESSURE” switches to “AUTO”.
9. Click or touch the “Start Test” button.