OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
48
SGSM
Connecting the Test
Cell
⅝"
⅝"
5/8
"
Thermocouple
Filter
Supply Line
1. Carefully place the cell into the heating jacket.
Make sure the transducer is pressed down completely in the bottom of the
heating jacket.
2. Align the cell as shown below.
3. Screw the
5/8
" connection on the high-pressure supply line to the bulkhead
connector. Leave the connection slightly loose for now.
Make sure the arrow on the filter is pointed toward the cell.
4.
Screw the ⅝" connection on the high-pressure supply line to the port on
the test cell. Use a wrench to tighten it completely.
5. Now use a
5/8
" wrench to tighten the supply line to the bulkhead connector
completely.
6.
Screw the thermocouple into the ⅝" port on the cell cap and leave it
loose. Plug the thermocouple into the port on the unit cabinet.
7. Carefully place the SGSM Head Assembly on top of the test cell. Connect
the Head Assembly to the UCA with the supplied Ethernet cable.