17
Inverter-Schwimmbadwärmepumpe
D
Bypass-Installationsschema für eine Wärmepumpe
Bypass-Installationsschema für mehr als eine Wärmepumpe
Der der Wärmepumpe vorgeschaltete Filter muss regelmäßig gereinigt werden,
damit das zirkulierende Wasser sauber ist und etwaige Funktionsprobleme aufgrund
von Verschmutzung oder Verstopfung des Filters vermieden werden.
Hydraulikanschluss
3.6
13
By-Pass assembly for one heat pump
By-Pass assembly for more than one heat pump
The filter located upstream of the heat pump must be regularly cleared so that the water in the system is
clean, thus avoiding the operational problems associated with dirt or clog- ging in the filter.
Ausgang
Automatische
Wasseraufberei-
tungsanlage
Pumpe
ZUM SCHWIMMBAD
VOM SCHWIMMBAD
Schwimmbad
Eingang
13
By-Pass assembly for one heat pump
By-Pass assembly for more than one heat pump
The filter located upstream of the heat pump must be regularly cleared so that the water in the system is
clean, thus avoiding the operational problems associated with dirt or clog- ging in the filter.
Ausgang
Ausgang
Pumpe
ZUM SCHWIMMBAD
VOM SCHWIMMBAD
Schwimmbad
Eingang
Eingang
Automatische
Wasseraufberei-
tungsanlage
11
3.3 Installation layout
3.4 Connecting the condensation draining kit
While operating, the heat pump is subject to condensation. This will result in a more or less large run-off of
water, depending on the degree of humidity. To channel this flow, we recommend that you install the
condensation drainage kit.
How do you install the condensation drainage kit|?
Install the heat pump, raising it at least 10 cm with solid water-resistant pads, then connect the drainage pipe to
the opening located under the pump.
3.5 Installing the unit on noise-damping supports
In order to minimize the noise pollution associated with heat pump vibrations, it can be positioned on vibration
absorbing pads.
To do this, you simply have to position a pad between each of the unit’s feet and its support, and then fix
the heat pump to the support with suitable screws.
Ventil
komplett geöff net
Ventil
halb geöff net
11
3.3 Installation layout
3.4 Connecting the condensation draining kit
While operating, the heat pump is subject to condensation. This will result in a more or less large run-off of
water, depending on the degree of humidity. To channel this flow, we recommend that you install the
condensation drainage kit.
How do you install the condensation drainage kit|?
Install the heat pump, raising it at least 10 cm with solid water-resistant pads, then connect the drainage pipe to
the opening located under the pump.
3.5 Installing the unit on noise-damping supports
In order to minimize the noise pollution associated with heat pump vibrations, it can be positioned on vibration
absorbing pads.
To do this, you simply have to position a pad between each of the unit’s feet and its support, and then fix
the heat pump to the support with suitable screws.