Page 29 of 85
5368 KUHL ROAD
●
ERIE, PENNSYLVANIA 16510
●
PHONE 814-899-4220
●
FAX 814-899-1410
A member of the Medical Illumination International Group
Section 3
Dual Ceiling Mount Installation
•
Position the two extension arms as shown in figure 10 to allow for easier mounting of the
remaining Dual mount section. Firmly press the fastened dual ceiling mount section against the
ceiling rod. While firmly holding the Dual ceiling mount section in place, remove only the cap
nuts from the 2” long bolts. It is strongly recommended that a second person hold the arms in
place while the nuts are removed. Place the remaining dual ceiling mount section onto the
bolts. Be sure the wires are enclosed within the wire channel to avoid pinching them. Replace
the cap nuts and fully tighten. Install the remaining four
3
/
8
” long mounting screws and then fully
tighten all eight screws.
Failure to tighten the cap nuts for the 2” long bolts can cause the arm/head assembly
to fall causing serious injury and/or property damage.
Failure to install or tighten all eight of the
3
/
8
” mounting screws can cause the
arm/head assembly to fall causing serious injury and/or property damage.
•
Check to make sure that the wire connections are seated far enough into the double casting
enclosure. Fasten the cover plates to the casting enclosure using the four
3
/
8
” long pan-head
screws (P/N 0001319) and plastic grommets (P/N 0001306) supplied in the hardware kit.
•
See the instructions for “Installation of Light Head to Arm” on page 40 to complete the
assembly.
Содержание VISTOR
Страница 1: ...VistOR Installation Service Manual...