32
-
MOUNTING INSTALLATION
MOUNTING TO THE CARRIER
1. Position the M35 Material Processor horizontal on wood blocks (t20) as shown.
2. Align the stick pin bore (m26). Install stick pin (m1).
3. Align the link pin bore (m25). Install the link pin (m2).
4. Clean away any dirt found on the hose connections then connect the whip hoses
(m3 and m4).
5. Connect the rotation whip hoses (m39) and hydraulic motor case drain whip hose
(m40).
6. Open the shut-off valves (k4).
The hydraulic lines must be handled carefully to prevent contamination from entering
the M35 Material Processor or the carrier hydraulic system.
REMOVAL FROM THE CARRIER
1. Retract the cylinders to open the jaws fully.
2. Shut off the carrier’s engine and relieve all hydraulic pressure.
3. Close the shut-off valves.
4. Disconnect the hydraulic hoses before laying the M35 Material Processor down.
Install metal plugs in the hydraulic hoses and metal caps on the stick tubes to keep
out contamination.
5. Position the M35 Material Processor horizontal on wood blocks (t20), as shown in
“MOUNTING TO THE CARRIER”
.
Содержание M35G
Страница 13: ... 13 SERIAL NUMBER LOCATION M35 ...
Страница 115: ... 115 WARRANTY STATEMENTS ...
Страница 116: ... 116 WARRANTY STATEMENTS ...
Страница 118: ... Copyright 2018 NPK Construction Equipment Inc www npkce com M000 9601B M35 Material Processor Instruction Manual 10 18 ...