-
97
-
TROUBLESHOOTING
1. CARRIER CIRCUIT RELIEF VALVE CHECK
Verify that the hydraulic system of the carrier meets the requirements of the M35
Material Processor.
A. Install a 0 – 5000 psi
(350 bar)
pressure gauge (g8f) in the #4 SAE test ports in
each of the shut-off valves at the end of the stick.
B. Turn the shut-off valve (k4) in the close circuit to the
“OFF”
position (k6).
C. Start the carrier. Set the throttle to the
“FULL”
position. Actuate the hydraulic
circuit to close the jaws.
D. The pressure reading should be at least 200 psi
(14 bar)
above the M35 Material
Processor operating pressure.
Note:
If the excavator relief setting is less than 200 psi
(14 bar)
above the M35
Material Processor operating pressure, reset the excavator accordingly. (See
specifications).
Содержание M35G
Страница 13: ... 13 SERIAL NUMBER LOCATION M35 ...
Страница 115: ... 115 WARRANTY STATEMENTS ...
Страница 116: ... 116 WARRANTY STATEMENTS ...
Страница 118: ... Copyright 2018 NPK Construction Equipment Inc www npkce com M000 9601B M35 Material Processor Instruction Manual 10 18 ...