Chapter 1: General Instructions
© 2019 Cutting Edge Optronics
10
Patara II and Iklwa II Service Manual
Service
Operation
Order of procedures
Replacing the
Module
1.
Coolant Line Purge (page 14)
2.
Remove Cover (page 28)
3.
Polarizer Removal and Installation (page 26)
Step 1-2
4.
Step 1
5.
Laser Module Replacement (page 23)
6.
7.
Removal Only
1.
Remove Q-switch from Beam Path (page 29)
2.
SHG Crystal Replacement and Alignment (page 30)
Step 1-2
3.
Laser Module Alignment (page 20)
4.
Q-Switch Replacement (page 27)
Replacement Steps Only
5.
Polarizer Removal and Installation (page 26)
Installation Only
6.
7.
Defeating the Cover Interlocks (page 41)
8.
Power the Laser for Alignment (page 39)
9.
SHG Replacement and Alignment (Step 15-20)
HR/HM Alignment (page 17-18)
Align Q-switch for Hold-Off (page 39)
Aperture Replacement (page 14)
Replacing the
Output Window
1.
Output Window Replacement (page 26)
Replacing the
Polarizer
Assembly
1.
Remove Cover (page 28)
2.
Polarizer Assembly Removal and Replacement (page 26)
3.
4.
5.
Power Laser on for Alignment (page 39)
6.
7.