Chapter 3: Tuning and Testing Procedures
© 2019 Cutting Edge Optronics
31
Patara II and Iklwa II Service Manual
6.
Carefully place the two white insulators on either side of the crystal, making
sure that the crystal fits into the groove of each piece. With the arrow on the
crystal pointing away from you, place the load spreader next to the insulator
on the right-hand side of the crystal as shown in
Figure 2-24
.
Figure 2-24: Insulators, Crystal and Load Spreader
7.
Press the other 0.002" piece of indium onto the top of the crystal, making sure
it is centered on the crystal and none of the indium is hanging over the edge.
Using a pair of tweezers, carefully move the insulators, crystal and load
spreader and place them into the SHG mount. Make sure that the Indium foil
remains in place on the crystal as shown in
Figure 2-25
.
Figure 2-25: Indium Foil Placement
8.
Thread in the 2 ball plungers (circled in yellow,
Figure 2-26
) until they press
the pieces into the wall of the mount. Back them off an eighth-turn as shown
in
Figure 2-25
.