Chapter 1: General Instructions
© 2019 Cutting Edge Optronics
8
Patara II and Iklwa II Service Manual
Service
Operation
Order of procedures
Replacing the
Flow Switch
1.
Remove Cover (page 28)
2.
Coolant Line Purge (page 14)
3.
Flow Switch Assembly Replacement (page 16)
4.
Leak Test (page 45)
5.
Replace the Fold
Mirror or OC
Optic
1.
Remove Cover (page 28)
2.
Fold Mirror / Output Coupler Replacement (page 17)
3.
Defeat Cover Interlocks (page 41)
4.
Power Laser for Alignment (page 39)
5.
Check for Bullseye (page 40)
If concentric go to step 7
6.
HR/HM Alignment (page 17-18)
(HR first if replacing Fold
Mirror, HM first if replacing OC)
7.
Check Hold-Off (page 40)
9.
Replace the HM
1.
Remove Cover (page 28)
2.
Align HeNe to Optic (page 12)
(reference point)
3.
Use HM adjustment screws to align HeNe reflection
back to reference point.
4.
Defeat Cover Interlocks (page 41)
5.
Power Laser for Alignment (page 39)
6.
Check for Bulleye (page 40)
If concentric go to Step 8
7.
(HR alignment may not be
necessary)
8.
9.