Chapter 3: Tuning and Testing Procedures
© 2019 Cutting Edge Optronics
32
Patara II and Iklwa II Service Manual
Figure 2-26: Ball Plungers for Mount
9.
Press the 0.010" indium foil onto the side of the copper block, and carefully
place it into the SHG mount with the Indium against the side opposite the ball
plungers. Thread in the ball plunger (circled in yellow,
Figure 2-27
) until it
presses the contact block into the wall of the mount as shown in
Figure 2-27
.
Back it off an eighth-turn.
Figure 2-25: Ball Plunger Holding Components in Place
10.
Thread in the ball plunger on the top of the assembly until tight, then back it
off an eighth-turn.
11.
Repeat step 10 with the 3 remaining ball plungers. The finished SHG
assembly is shown in
Figure 2-26
.