Safety Instructions
NFP - rev. 04 / 23.05.2018
page 11
WARNING
Disconnect the systems from mains
Maintenance, cleaning and/or repairs (by qualified personnel only) may only be performed
when de-energised.
Disregarding may lead to electric shocks.
Putting into operation by trained experts only
The entire measurement system shall be installed and put into operation by trained expert
personnel only.
Integrated buffer battery
The exchange of the integrated buffer battery shall be carried out by NIVUS staff or per-
sonnel authorised by NIVUS only. Otherwise the guarantee expires.
4
Liability disclaimer
The manufacturer reserves the right to change the contents of this document including this li-
ability disclaimer without prior notice and cannot be held responsible in any way for possible
consequences resulting from such changes.
For connection, initial start-up and operation as well as maintenance of the unit the following
information and higher legal regulations of the respective country (in Germany e. g. VDE reg-
ulations) such as applicable Ex regulations as well as safety requirements and regulations in
order to avoid accidents shall be observed.
All operations on the device which go beyond installation or connection measures in principle
shall be carried out by NIVUS staff or personnel authorised by NIVUS due to reasons of safe-
ty and guarantee.
Operate the transmitter only in technically perfect working order.
Improper Use
Not being operated in accordance with the requirements may impair the safety. The manufac-
turer is not responsible for failures resulting from improper use.
5
Use in accordance with the requirements
Note
The instrument is intended solely for the purpose described below.
Modifying or using the instruments for any other purposes without the manufacturer’s writ-
ten consent will not be considered as use in accordance with the requirements.
The manufacturer cannot be held responsible for any damage resulting from improper use.
The user alone bears any risk.
The permanent flow meter Type NFP - NIVUS Full Pipe including the accompanying sensors
is designed for continuous flow measurement of slight to heavily polluted media in permanent
full pipes.
Содержание NFP
Страница 82: ...Instruction Manual NIVUS Full Pipe page 82 NFP rev 04 23 05 2018 Approvals and certificates...
Страница 83: ...Approvals and certificates NFP rev 04 23 05 2018 page 83...
Страница 84: ...Instruction Manual NIVUS Full Pipe page 84 NFP rev 04 23 05 2018...
Страница 85: ...Approvals and certificates NFP rev 04 23 05 2018 page 85...
Страница 86: ...Instruction Manual NIVUS Full Pipe page 86 NFP rev 04 23 05 2018...
Страница 87: ...Approvals and certificates NFP rev 04 23 05 2018 page 87...