background image

English – 

17

25

26

When connecting 2 NiceHansa Robus in the Master-Slave mode, pay attention that:

• All devices must be connected to the NiceHansa Robus Master (as in fig. 26) including the radio receiver.

• When using buffer batteries, each motor must have its own battery.

• All programming performed on NiceHansa Robus Slave are ignored (those on NiceHansa Robus Master override the others) except for those men-

tioned in table 14. 

LUCYB

S.C.A.

MOFB

MOSE

OPEN CLOSE

LUCYB

S.C.A.

STOP

PP

7.3.5) NiceHansa Robus in “Slave” mode

Properly programming and connecting, NiceHansa Robus can func-
tion in “Slave” mode; this type of function is used when 2 opposite
gates need to be automated with the synchronised movement of the
two leaves. In this mode NiceHansa Robus works as Master com-
manding the movement, while the second NiceHansa Robus acts as
Slave, following the commands transmitted by the Master (all Nice-
Hansa Robus are Masters when leaving the factory). 
To configure NiceHansa Robus as a Slave the level one “Slave mode”
must be activated (see table 7).

The connection between NiceHansa Robus Master and NiceHansa
Robus Slave is made via BlueBus.

In this case the polarity of the connections between the

two NiceHansa Robus must be respected as illustrated in
fig. 26 (the other devices remain with no polarity).

Follow the operations below to install 2 NiceHansa Robus in the Mas-
ter and Slave mode:
• Install the 2 motors as indicated in fig. 25. It is not important which

motor is to function as Slave or Master; when choosing, one must
consider the convenience of the connections and the fact that the
Step-by-Step command of the Slave only allows the Slave leaf to be
opened fully. 

!

• Connect the 2 motors as shown in fig. 26. 
• Select the opening direction of the 2 motors as shown in fig. 25 (see

also paragraph “4.1 Choosing the direction”).

• Supply power to the 2 motors.
• Program the “Slave mode” on the NiceHansa Robus Slave (see table

7).

• Perform the device recognition on the NiceHansa Robus Slave (see

paragraph “4.3 Recognition of the devices”).

• Perform the device recognition on the NiceHansa Robus Master (see

paragraph “4.3 Recognition of the devices”).

• Perform the recognition of the leaf length on the NiceHansa Robus

Master (see paragraph “4.4 Recognition length of the leaf”). 

Содержание Robus 250

Страница 1: ...NiceHansa Robus Instructions and warnings for installation and use 250 500...

Страница 2: ...be disposed of in compliance with local regulations If a fault occurs that cannot be solved using the information provided in this manual refer to the NICE customer service department In the event tha...

Страница 3: ...des the only data needed to determine whether the products of the NiceHansa Robus line are suit able for the intended application The structural characteristics of NiceHansa Robus make it suitable for...

Страница 4: ...r example for RB 500 if the leaf is 5 m long it will be possible to have 25 cycles hour and 13 consecutive cycles However if the leaf weighs 500 Kg they must be reduced to 75 resulting in 15 cycles ho...

Страница 5: ...1 power supply cable longer than 30 m may be used provided it has a larger gauge e g 3x2 5mm2 and that a safety grounding system is provided near the automation unit Note 2 If the BLUEBUS cable is lo...

Страница 6: ...ed in water or other liquids Keep NiceHansa Robus away from heat sources and open flames in acid saline or potentially explosive atmosphere this could damage NiceHansa Robus and cause malfunctions or...

Страница 7: ...n bring the bracket forward by at least 2 cm and secure it to the rack with the appropriate dowels The ideal distance of the bracket for inductive limit switches is between 3 and 8 mm as indicated in...

Страница 8: ...to collect together and join the cables which enter the gear motor Place the clamp just underneath the hole the cables enter through Make a hole in the rubber membrane which is slightly smaller than t...

Страница 9: ...the gearmotor with respect to the leaf If the leaf must move left for opening the selector must be moved towards left as shown in Figure 18 alternatively if the leaf has to move right during opening...

Страница 10: ...light flashes at a speed of 0 5 seconds on and 0 5 seconds off If present also check the flashes of the light connected to the S C A terminal slow flash es during opening quick flashes during closing...

Страница 11: ...pare the declaration of conformity of the automation system and deliver it to the owner 5 Prepare the Instructions and warnings for the use of the automa tion system and deliver it to the owner 6 Prep...

Страница 12: ...function is active the control unit will switch the BLUEBUS output and consequently the devices and all the LEDs off one minute after the end of the manoeuvre The only LED which will remain on is the...

Страница 13: ...conds between pressing one key and another If a longer period of time lapses the procedure will finish auto matically and memorize the modifications made up to that stage 1 Press the key Set and hold...

Страница 14: ...ED starts flashing L1 3 Press key or to move the flashing LED onto the input LED representing the parameter which is to be changed or 4 Press the key Set and hold it down during step 5 and 6 5 Wait ap...

Страница 15: ...e the key Set 7 Press the key four times to move the flashing LED to LED L5 L5 8 Press the key Set and hold it down during step 9 and 10 9 Wait approx 3 seconds until LED L5 representing the current l...

Страница 16: ...unit must go through the recognition process see paragraph 7 3 6 Recognition of Other Devices 7 3 4 FT210B Photo sensor The FT210B photo sensor unites in a single device a force limiting device type...

Страница 17: ...ted see table 7 The connection between NiceHansa Robus Master and NiceHansa Robus Slave is made via BlueBus In this case the polarity of the connections between the two NiceHansa Robus must be respect...

Страница 18: ...the recognition stage is completed L1 and L2 LED s will go off the STOP LED must remain on while L1 L8 LED s will light up according to the status of the relative ON OFF functions L1 L2 After you have...

Страница 19: ...h if 10 of the manoeuvres hasn t been reached 8 Release the key Set Table 17 control of the number of manoeuvres performed Example Manoeuvre counter reset After the maintenance of the system has been...

Страница 20: ...roximately 10 30Vdc if there is voltage the problem is due to the lamp in this case replace the lamp with one having the same characteristics if there is no voltage there may have been an overload on...

Страница 21: ...ry second When something is wrong the flashes are more frequent the light fla shes twice with a second s pause between flashes 6 flashes 1 second s pause 6 flashes At the starting of the manoeuvre the...

Страница 22: ...ormal operation the device indicates Stand by is not active During normal operation the device indicates Stand by is active Function programming in progress If it flashes together with L3 it means tha...

Страница 23: ...s suitable for the automation of gates featuring weights or lengths as shown in Tables 2 3 and 4 Durability Estimated between 20 000 and 250 000 cycles following the conditions indicated in table 4 Th...

Страница 24: ......

Страница 25: ...n devices that prevent movement if people or objects are in the way guaranteeing safe and reliable acti vation However children should not be allowed to play in the vicinity of automated systems to pr...

Страница 26: ...me seems not to work as well or not to work at all it may simply be that the battery is exhau sted depending on the type of use it may last from several months up to one year and more In this case you...

Страница 27: ......

Страница 28: ...10 06 2011 www nicehansa co za Nice Hansa SA 27 Davies Rd Malvern Germiston Tel Share Call 0860 642 672 Tel 27 11 615 0075 6 Fax 27 11 615 0083 info nicehansa co za...

Отзывы: