
NOTICE
The load management screen can be accessed by pressing the Load Shed button on the AC Power screen.
INVERTER STATUS
The inverter status is displayed on this screen. The user can turn an inverter ON or OFF using the "change" buttons on
this screen. Please note that the option for a second inverter is only available in King Aire coaches.
LOAD MANAGEMENT
The load management screen displays the power phase setting and service capacity and may be selected from the
main AC Power screen.
The current amp draw is displayed for both power legs on this screen. The user can select the
Load Status
screen by
tapping the Loads button and access the
Settings
screen by tapping the Settings button.
LOAD SETTINGS
The load settings function is accessed by tapping the Settings button from the Load Management screen. Use the UP
and DOWN arrows on the left side of the screen to navigate to more Load Settings.
The following settings control the load shedding amperage values.
© 2018 Copyright Newmar Corporation. All rights reserved. For the most up-to-date version of this content, and for more product-specific information, please refer to Newgle.
160