
Dutch Star Access Point
Mountain Aire Access Point
King Aire Access Point
IMPORTANT
If at any stage something is not understood, or if the
room begins to bind, do not force the room. Contact
Newmar Customer Support for assistance.
2. Using the wrench provided, a personal wrench or a tire iron with a 1-1/8" opening, rotate either mechanism's
threaded rod clockwise six complete turns.
IMPORTANT
Do not use an impact wrench to turn lift bolts.
3. Move to the other room extension mechanism, and
rotate the threaded rod clockwise 12 complete turns.
4. Return to the first room extension mechanism, and
rotate the threaded rod clockwise 12 complete turns.
Repeat steps three and four, alternating from
mechanism to mechanism, rotating each threaded rod
12 complete turns until room is sealed. Do not exceed
15 ft. lbs. Make sure the room does not bind.
NOTICE
Leave the solenoid valves open, the lift bolts and threaded rods in place until the room has been serviced.
EXTENDING ROOM AFTER SERVICE
1. Room lift bolts should not be retracted yet. Push and hold the room switch to "retract" for five to ten seconds.
© 2018 Copyright Newmar Corporation. All rights reserved. For the most up-to-date version of this content, and for more product-specific information, please refer to Newgle.
140