Chapter 2 - Blade Installation and Startup
Chapter 2
2 - 89
S
ECTION
2-9
BLADE STARTUP
2.9.1
Initial Extension Blade Installation
1.
Plug the blades into each chassis slot in numerical order.
The order in which the station blades (SLIU,
ESIU, 082U) are physically inserted determines the numbering plan.
The installer must install
extension blades in order (i.e.; slot 2 first, slot 3 next, slot 4 next, etc.) for a sequential numbering plan.
For example, with a 16ESIU in slot #2 (ext. 301-316), when 3 more 16ESIU blades are installed in the
following order, the numbering plan below would apply:
Adding a daughter board to increase the available ports or going to a higher capacity blade (ex: 8ESIU to
a 16ESIU) may require that you delete the slot and reinstall the blade. In the following example, to add a
daughter board to slot 3, the blade must be removed, deleted in Program 90-05-01, then reinstalled with
the daughter board attached otherwise the additional ports would not be recognized. This however, will
use new ports for the combined blade - the initial ports (ports 17-24 using the example below) are not
used.
2.
The system will automatically recognize each blade as it is installed in the system.
If a blade has
previously been installed
in a slot and another type of blade is to be installed in that same slot, the blade
must be first be removed from the chassis and then the slot definition removed using Program 90-05
prior to installing the new blade.
This same condition applies to extensions and other devices connected to the system. For example, if a
port was previously used for a keyset and a DSS Console is to be installed in that same port, it must first
be undefined in Program 10-03 before the console is connected.
Order of
Install
Blade Slot #
Blade
Extension
Numbers
1
2
16ESIU
301-316
2
3
16ESIU
317-332
3
5
8SLIU
(no daughter
board)
333-340
4
4
8ESIU
341-348
Initial Setup
Updated Setup
Blade Slot
#
Blade
Extension
Numbers
Blade Slot
#
Blade
Extension
Numbers
2
16ESIU
301-316
2
16ESIU
301-316
3
8SLIU
(no daughter
board)
317-324
3
---
4
16ESIU
325-340
4
16ESIU
325-340
5
8SLIU
(with daughter
board)
341-356
Содержание UX5000
Страница 12: ...x Table of Contents Table of Contents...
Страница 18: ...1 6 Chapter 1 Chapter 1 Installing the Chassis...
Страница 26: ...1 14 Chapter 1 Chapter 1 Installing the Chassis...
Страница 80: ...1 68 Chapter 1 Chapter 1 Installing the Chassis Figure 1 90 19 CHASSIS A RACK MOUNT INSTALLATION...
Страница 84: ...1 72 Chapter 1 Chapter 1 Installing the Chassis...
Страница 90: ...2 4 Chapter 2 Chapter 2 Blade Installation and Startup...
Страница 98: ...2 12 Chapter 2 Chapter 2 Blade Installation and Startup...
Страница 113: ...Chapter 2 Blade Installation and Startup Chapter 2 2 27 Figure 2 11 EXIFU CABLING...
Страница 118: ...2 32 Chapter 2 Chapter 2 Blade Installation and Startup Figure 2 15 INTRAMAIL COMPACT FLASH CARD...
Страница 144: ...2 58 Chapter 2 Chapter 2 Blade Installation and Startup...
Страница 172: ...2 86 Chapter 2 Chapter 2 Blade Installation and Startup...
Страница 174: ...2 88 Chapter 2 Chapter 2 Blade Installation and Startup...
Страница 208: ...4 14 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 212: ...4 18 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 220: ...4 26 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 222: ...4 28 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 224: ...4 30 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 226: ...4 32 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 228: ...4 34 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 254: ...4 60 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 260: ...4 66 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 274: ...4 80 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 284: ...5 4 Chapter 5 Chapter 5 LAN Connection...
Страница 332: ...vi Index Index...