
2 - 18
Chapter 2
Chapter 2 - Blade Installation and Startup
The CCPU without a MEMDB attached supports:
The CCPU with a MEMDB attached and limited port licensing supports:
The CCPU with a MEMDB attached and full port licensing supports:
Connector
Connector Description
CN1
Backboard Connection
CN2
MEMDB-A1 (Expanded Memory) Connection
CN3
VOIPDB Blade Connection
CN4
VMBU Blade Connection
CN5
USB Memory Connection (used for upgrading software or downloading system
data)
CN6/SW2
Used for Debug Purposes
CN7
Ethernet Cable Connection (for PCPro or WebPro, CTI, ACD MIS, IP Phone)
CN8/CN9
Pin Sub-Mini Jack for External Source Connection (External MOH, External
Speaker, etc.)
CN10
External Source Control Connection
LOAD/SW1
Load Switch
BAT
Lithium Battery Socket (for backup of SRAM memory data)
SW6
CCPU Setup Dip Switches (normally left as is)
•
64 Ports for IP/Digital Trunks/
Extensions
•
Expansion Chassis
•
VOIPDB
•
8 IntraMail/VRS Ports
•
BRI S-Bus/T-Bus
•
PRI Trunks
•
T1 Trunks
•
Tie Line Trunks
•
(1) 082U Blade
•
ACD/inDepth
•
Third-Party CTI/TAPI 2
•
256 Ports for IP/Digital Trunks
(200 max.) / Extensions
(256 max.)
•
Expansion Chassis
•
VOIPDB
•
16 IntraMail/VRS Ports
•
BRI S-Bus/T-Bus
•
PRI Trunks
•
T1 Trunks
•
Tie Line Trunks
•
Multiple 082U Blades
(1 per 9.5” base chassis
or 1 per 19” chassis max.)
•
ACD/inDepth
•
Networking (CygniLink
and AspireNet)
•
Recovery Point
•
Remote Maintenance
•
Third-Party CTI/TAPI 2
•
712 Ports for IP/Digital Trunks
(200 max.) / Extensions
(512 max.)
•
Expansion Chassis
•
VOIPDB
•
16 IntraMail/VRS Ports
•
BRI S-Bus/T-Bus
•
PRI Trunks
•
T1 Trunks
•
Tie Line Trunks
•
Multiple 082U Blades
(1 per 9.5” base chassis
or 1 per 19” chassis max.)
•
ACD/inDepth
•
Networking (CygniLink
and AspireNet)
•
Recovery Point
•
Remote Maintenance
•
Third-Party CTI/TAPI 2
Содержание UX5000
Страница 12: ...x Table of Contents Table of Contents...
Страница 18: ...1 6 Chapter 1 Chapter 1 Installing the Chassis...
Страница 26: ...1 14 Chapter 1 Chapter 1 Installing the Chassis...
Страница 80: ...1 68 Chapter 1 Chapter 1 Installing the Chassis Figure 1 90 19 CHASSIS A RACK MOUNT INSTALLATION...
Страница 84: ...1 72 Chapter 1 Chapter 1 Installing the Chassis...
Страница 90: ...2 4 Chapter 2 Chapter 2 Blade Installation and Startup...
Страница 98: ...2 12 Chapter 2 Chapter 2 Blade Installation and Startup...
Страница 113: ...Chapter 2 Blade Installation and Startup Chapter 2 2 27 Figure 2 11 EXIFU CABLING...
Страница 118: ...2 32 Chapter 2 Chapter 2 Blade Installation and Startup Figure 2 15 INTRAMAIL COMPACT FLASH CARD...
Страница 144: ...2 58 Chapter 2 Chapter 2 Blade Installation and Startup...
Страница 172: ...2 86 Chapter 2 Chapter 2 Blade Installation and Startup...
Страница 174: ...2 88 Chapter 2 Chapter 2 Blade Installation and Startup...
Страница 208: ...4 14 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 212: ...4 18 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 220: ...4 26 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 222: ...4 28 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 224: ...4 30 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 226: ...4 32 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 228: ...4 34 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 254: ...4 60 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 260: ...4 66 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 274: ...4 80 Chapter 4 Chapter 4 Terminals and Optional Equipment...
Страница 284: ...5 4 Chapter 5 Chapter 5 LAN Connection...
Страница 332: ...vi Index Index...