CHAPTER 6
ND-70185 (E)
Page 142
Revision 3.0
POST INSTALLATION TEST
FCCS Network Connection Test
3.4 3-party Conference Trunk Function Test (via FCCS)
Perform the 3-party conference trunk function test, following the procedures listed below.
STEP 1:
Using the MBTK Command, make busy all 3-party Conference Trunk (CFTs) except the trunk to be
tested.
STEP 2:
Establish a station-to-station connection between STNs A and B in self node (Node A).
STEP 3:
STN A goes to Switch Hook Flash (SHF), and after hearing SPDT, dials the Telephone Number of
STN C in other node (Node B).
STEP 4:
STN C answers the call.
STEP 5:
STN A, after a brief talk with STN C, makes a SHF, and confirms that a three-way connection has
been set up.
STEP 6:
Release the call.
STEP 7:
Repeat the above steps for all CFTs.
STEP 8:
Using the MBTK command, cancel the make-busy status of the trunk.
Figure 6-11 3-party Conference Trunk Function Test via FCCS
Note:
When a station activates this feature, CFT in Self-Node is used. In this case, CFT in Node A is used.
3.5 FCCS Alternate Routing Test
This section explains how to perform the test for Fusion-link alternate routing. Following the procedures
below, make sure that the connection and alternate routing to all FCCS lines are normal and correctly es-
tablished.
Check
LC
LC
FCCS
STN A
TELN: 410000
STN: 2000
LC
STN B
TELN: 410001
STN: 2001
STN C
TELN: 420000
STN: 2000
Node A (Self-Node)
Node B
RG
RBT,
SPDT
C
F
T
TSW / MUX Card
SHF
+
TELN: 420000
Содержание NEAX 2400 IMX
Страница 43: ...CHAPTER 3 ND 70185 E Page 28 Revision 3 0 This page is for your notes Get other manuals https www bkmanuals com...
Страница 71: ...CHAPTER 4 ND 70185 E Page 56 Revision 3 0 This page is for your notes Get other manuals https www bkmanuals com...
Страница 183: ...CHAPTER 7 ND 70185 E Page 168 Revision 3 0 This page is for your notes Get other manuals https www bkmanuals com...
Страница 213: ...CHAPTER 8 ND 70185 E Page 198 Revision 3 0 This page is for your notes Get other manuals https www bkmanuals com...