CHAPTER 6
ND-70185 (E)
Page 144
Revision 3.0
POST INSTALLATION TEST
Fusion and Non-Fusion Connection Tests
4.1 When Seizing a Trunk from a Station
STEP 1:
Using the MAT command, make busy all trunks in the route except the trunk to be tested.
STEP 2:
Station A in self-node (Node A) dials the Physical Station Number for Station B in Node C.
STEP 3:
The call terminates to Station B via FCCS and non-FCCS.
STEP 4:
Confirm the speech condition is sufficient (no noise, not one-way speech, etc.).
STEP 5:
Replace the handset of STN A.
STEP 6:
Repeat the above steps for all Fusion links.
4.2 When Seizing a Trunk from an ATTCON
STEP 1:
The operator at the ATTCON in Self-Node (Node A) dials Physical Station Number for Station B in
Node C.
STEP 2:
The call terminates to Station B via FCCS and non-FCCS.
STEP 3:
Confirm the speech condition is sufficient (no noise, not one-way speech, etc.)
STEP 4:
The operator at the ATTCON releases the call by pressing the CANCEL key.
Figure 6-13 CCIS-FCCS Outgoing Call Test
Check
Check
LC
LC
STN B
TELN: 420000
STN: 2000
STN A
TELN: 410000
STN: 2000
ATTCON
Node A (Self-Node)
Node C
Node B
ATI
FCCS
Non-FCCS
Содержание NEAX 2400 IMX
Страница 43: ...CHAPTER 3 ND 70185 E Page 28 Revision 3 0 This page is for your notes Get other manuals https www bkmanuals com...
Страница 71: ...CHAPTER 4 ND 70185 E Page 56 Revision 3 0 This page is for your notes Get other manuals https www bkmanuals com...
Страница 183: ...CHAPTER 7 ND 70185 E Page 168 Revision 3 0 This page is for your notes Get other manuals https www bkmanuals com...
Страница 213: ...CHAPTER 8 ND 70185 E Page 198 Revision 3 0 This page is for your notes Get other manuals https www bkmanuals com...