
Narda
IDA
-
3106
197
Figure 45: The
Duty Cycle
evaluation function
To activate the Duty Cycle function:
1.
Press the
Evaluation
softkey, then press the
Duty Cycle
softkey.
2.
Use the
Entry
softkey to select the method of entering the integration
range:
– Graphical = Entry by moving the markers
– Numerical = Numerical entry of values
3.
Specify the integration range using the four
Time Integration ...
(1)
softkeys
– Graphical: Press one of the softkeys and then use the rotary control
knob to move the marker to the desired position.
– Numerical: Press one of the softkeys and set the value.
The selected values as well as the ratio Pavg/Ppeak are shown in the
upper part of the screen.
1
2
Содержание IDA
Страница 1: ...IDA 3106 Interference and Direction Analyzer Operating Manual IDA IDA 2...
Страница 8: ...Contents VI IDA 3106 Narda...
Страница 28: ...2 Important Safety Instructions 20 IDA 3106 Narda...
Страница 134: ...6 Common Functions 126 IDA 3106 Narda...
Страница 166: ...7 Direction Finding Mode 158 IDA 3106 Narda...
Страница 188: ...9 Level Meter Mode 180 IDA 3106 Narda...
Страница 206: ...10 Time Domain Scope Mode 198 IDA 3106 Narda...
Страница 218: ...11 I Q Analyzer Mode 210 IDA 3106 Narda...
Страница 238: ...13 Measurement Data Memory 230 IDA 3106 Narda...
Страница 242: ...14 Maintenance Repairs Updates 234 IDA 3106 Narda...
Страница 246: ...15 PC Software 238 IDA 3106 Narda...
Страница 254: ...16 Remote Control 246 IDA 3106 Narda...
Страница 269: ...17 4 Antenna handle and antennas Narda IDA 3106 261 17 4 7 Antenna factors typical...
Страница 272: ...17 Specifications 264 IDA 3106 Narda...
Страница 279: ...Narda IDA 3106 271 19 Glossary The meanings of terms and abbreviations are explained in this chapter...
Страница 284: ...19 Glossary 276 IDA 3106 Narda...
Страница 290: ...Index 282 IDA 3106 Narda...
Страница 291: ......