■
Scan Time of the Programmable Controller
• The process of input update, program execution, and output update is referred to as a
scan
and the process
repeated over and over in the same manner is referred to as the
cyclic execution method
.
• In the cyclic execution method, since the process of input update is performed immediately after the output
update, the process of input update and output update is sometimes called
I/O update
for the purpose of
simplification.
• In addition to program execution and I/O update, the programmable controller also performs a variety of error
checking (self-diagnostic function) and also communicates with the programming tools. These operations are
referred to, as a whole, as
tool services
and are performed after program execution.
• Since the
scan time
is defined as the time required for one scan, the cyclic operation of a scan (I/O update,
program execution, and tool service) can be shown below.
Program
execution
Program
execution
Scan time
Scan time
I/O update
Tool services
I/O update
Tool services
61
4-1. Operating Principles of the Programmable Controller
4-1. Operating Principles of the Programmable Controller
Содержание FP1
Страница 1: ...PROGRAMMABLE CONTROLLER FP1 is a global brand name of Matsushita Electric Works Hardware ...
Страница 28: ...20 ...
Страница 98: ...90 ...
Страница 150: ...142 ...
Страница 208: ...200 ...
Страница 226: ...218 ...
Страница 280: ...272 ...